Types of work performed

The cost is calculated individually - contact us to receive a commercial offer.

Name of work Unit of measurement
1 External power supply project according to technical conditions
2 Internal power supply project according to technical assignments
3 Lightning protection project according to technical assignments
Name of work Unit of measurement
1 Installation of a 10/0.4 kV KTP substation pcs
2 Construction of a trench in the ground m.p.
3 Construction of a trench in asphalt m.p.
4 Cable installation up to 120 mm. sq. m.p.
5 Installation of support using drilling method (depending on quantity) pcs
6 Installation of support on the foundation (depending on quantity) pcs
7 Installation of SIP span pcs
8 Installation of cable coupling 0.4 kV pcs
9 Installation of cable coupling 10 kV ASB, AShV, ABL pcs
10 Installation of cable joint 10 kV APvEgPu (cross-linked polyethylene) pcs
11 Installation of switch and fuses (250–630A) pcs
12 Installation of the grounding system (with material) set
13 Installation of lightning protection according to the project
14 Installation of diesel generator up to 160 kVA pcs
15 Installation of automatic transfer switches up to 160A pcs
16 Installation of ASU pcs
17 Installation of main switchboard pcs
18 Electrolaboratory measurements according to technical assignments
19 Installation of the SHU-1 metering cabinet for one input pcs
20 Installation of a SHU-2 metering cabinet with two inputs pcs
21 Current transformer installation pcs
22 Local data acquisition and processing equipment (LOSOD) according to the project
23 Automated commercial accounting system (ASCAE) according to the project
Name of work Unit of measurement
Replacing electrical wiring
1 In a 1-room apartment set
2 In a 2-room apartment set
3 In a 3-room apartment set
4 In a 4-room apartment set
Drilling holes for the socket box
1 In a plasterboard wall pcs
2 In a brick wall pcs
3 In a concrete wall pcs
4 Installation of a socket box pcs
5 Installation of socket, switch (mechanism) pcs
Drilling holes for the junction box
1 In a plasterboard wall pcs
2 In a brick wall pcs
3 In a concrete wall pcs
4 Installation of overhead distribution box pcs
Laying open wiring
1 On brackets on a brick wall m.p.
2 On brackets on a concrete wall m.p.
3 In corrugated or PVC pipe m.p.
Installation and connection
1 1 ph of electricity meter pcs
2 3ph electricity meter pcs
3 Connecting a voltage stabilizer (220V) pcs
4 Installation of motion sensors, twilight relays, etc. pcs
5 Intercom installation pcs
6 Video camera installation pcs
7 Installation of a video surveillance system according to the project
8 Installation of lamps and sconces pcs
9 Installation of chandeliers up to 5 lamps pcs
10 Installation of a box with a step-down transformer 220/36 pcs
11 Electrical installation vending machines 220V pcs
12 Electrical installation automatic machines 380V pcs
13 Installation of differential relay and differential machine guns pcs
14 Installation and connection of a heated floor thermostat pcs
15 Installation of overvoltage relay pcs
16 Installation of 3-phase sockets pcs
17 Installation of anti-flood system pcs
Installation of switchboards
18 Construction of a niche for a shield up to 36 positions. in concrete pcs
19 Construction of a niche for a shield up to 36 positions. in brick pcs
20 Construction of a niche for a shield up to 36 positions. in drywall pcs
21 Installation of a shield up to 36 positions. interior pcs
22 Installation of a shield up to 36 positions. outer pcs
23 Installation of a shield over 36 positions. interior pcs
24 Installation of a shield over 36 positions. outer pcs